+44 (0)1595880100

WHD Plant Ltd Shetland

Complete civil works and infrastructure for 10 houses.

Hjaltland Housing Scheme - Aith

  • Cleared soil from site.
  • Excavated and concreted 10 house foundations.
  • All services brought onsite and connected to each house. 
  • Poured concrete floor slabs.
  • SUDS drainage system installed.
  • Foul and Surface Water drainage installed.
  • ​Driveways kerbed and lock blocked.
  • Main access road kerbed and tarred including footpaths. 
  • Spur access road kerbed and lock blocked.
  • Gardens top soiled and turfed.