WHD Plant Ltd Shetland
  • Cleared vegetation from site.
  • Excavated and concreted 4 house foundations and a block of flats.
  • All services brought onsite and connected to each building. 
  • Poured concrete floor slabs.
  • SUDS drainage system installed.
  • Foul and Surface Water drainage installed.
  • ​Driveways kerbed and tarred.
  • Main access road kerbed and tarred including footpaths. ​
  • Gardens top soiled and turfed.

Hjaltland Housing Scheme - Ladies Mire, Brae

+44 (0)1595880100

Carried out all the civil construction works.