House Extension Groundworks - Burra  

This project involved making digging to make room for the new extension.The trench foundations were excavated, mesh reinforcing installed and concrete poured. The existing services were extended into the new extension and new drainage was installed. This area required a radon barrier which we installed before pouring the concrete floor slab. Once the house extension had been built we returned to install some slab paving.

House extension excavation, foundations, floor slab up to wall plate and after house extension was completed we installed some slab paving.