  • Access road to site formed with infilled material.
  • House site area stripped of soil.
  • House site area filled with compacted hardcore infill material.
  • Trench foundations excavated and concreted.
  • Services brought into the property.
  • Foundation concrete floor slab poured.
  • Underfloor heated concrete floor slab poured. 
  • ​Finally site drainage installed. 

House Site - Quarff 

Infilled house site excavation, foundations and floor slab up to wall plate.