+44 (0)1595880100
M & R Gear - Lerwick
We excavated the existing forecourt concrete, repaired the existing gully and poured a new concrete slab in front of the main doors. The rest of the forecourt area was graded with hard-core and compacted before laying the tarred surface.
Prepared forecourt, installed necessary drainage and finished with tarring.