This project involved forming a new access road around the side of a hill leading to a new house site. The first stage was to install a cross drain and to divert the existing services to allow site vehicle access. We then formed the access road through cutting and using the material to form the road. There were rocky areas that required breaking and an open drain had to be installed on the upper side of the road. Finally the house site was excavated, levelled and all embankments were dressed with topsoil. 

Site Clearance and Access Road - Hamar, North Mavine 

Cleared the site and made an access road.